Annexation Phase V – Project 25 – Lake Rim Estates
Project Details
- Project 25 Map
- Design Start: March 2019
- Design Completion: October 2021
- Construction Start: April 2024
- Services: Sewer – 245 | Water – 22
- Engineer Design Firm: Moorman, Kizer, and Reitzel
- Contractor: TA Loving Company
Communications
- Project 25- Construction Schedule (12/3/24)
- Area 25- Meeting Handout (04/2024)
- Area 25- Construction Begins Letter (04/2024)
- Area 25_Construction Meeting Invite (03/2024)
- Construction Resolution- Project 25 (03/2020)
- Public Hearing Notice-Project 25 Preliminary Assessment (02/2020)
- Preliminary Assessment Resolution- Project 25 (12/2019)
The Construction Process
There are several phases to the construction process. PWC ensures that the Contractor makes every effort to limit interruptions and the impact on residents during each phase of the construction process. First, you will see design engineers and surveyors canvassing the area to determine the layout of the sewer collection system. Once the design is complete, the project will be bid and the construction phase will begin.
When construction begins, asphalt will be removed from the street and excavation crews will begin installing the sewer mains. This is typically done in one city block-sized area at a time. A second excavation crew will then install the laterals from the sanitary sewer main to the right of way. It will be the homeowner’s responsibility to connect from the clean out to the home once they are notified connections can begin.
Smaller excavations may be necessary throughout the construction process to test the lines and perform compaction testing to ensure the new asphalt does not fail. Once all excavation and testing have been completed, the contractor will then patch the asphalt and restoration will take place.
This information is subject to change.